The speakers ' page

 

In reference to our recruitment initiative technical and specialized speakers designed to test the product IgroDry directly on site, We show, in order of receipt, the technical reports received to date.

The Legend Of The:
the sign indicates report is not provided or not yet completed
the sign indicates partial or report delivery time
the sign indicates full and report

Excluding video, directly visible on the page, written reports or bigger photo, will be provided in PDF format.
If your system is unable to view these files you will most likely miss the software used for this purpose.
speakersWe recommend using ’ then the Adobe Reader® downloadable from This link.
For obvious organizational reasons this page will be constantly updated and may vary without notice.

 


List of independent rapporteurs (and work related) in chronological order of receipt.


Speaker William Faro Gonzaga (MN)
IgroDry application 2301 external on masonry in a single-family house in the locality of Gonzaga

Written report Video report Photo report

PDFLgWritten report of 5 March 2015 RelIMGFaro

 


Rapporteur Antonio Piras – Tonara (NU)
Igrodry application 2301 on the load-bearing internal walls of brick 30x30x15 bricks on a civilian House dwelling in the locality of Tonara, in the province of Nuoro, built in 1983

Written report Video report Photo report

PDFLg Written report of 9 April 2015 AntonPirasAntepr

 


Mr Lai Gino – Pieve Torina (MC)
Technical report on the product IgroDry 2301 tested on nineteenth-century historical building in historical centre in Via Zampeschi in Tolentino (MC) affected by ambient humidity on the ground floor.

Written report Video report Photo report

PDFLg Written report of 21 April 2015 Lapucci Tolentino Preview

 

_________

Technical report on the product IgroDry 2301 tested on sandstone wall of sixteenth-century historic building in Camerino (MC) suffering from severe humidity lifts.

Written report Video report Photo report

PDFLgSecond report of the 3 may 2015

 

Lapucci Camerino Preview

 


Rapporteur Arch. Mario Mariano – San Benedetto Del Tronto (AP)
Technical report IgroDry application 2301 on the inner walls of an apartment on the ground floor in the municipality of Monteprandone (AP).

Written report Video report Photo report

PDFLg Written report of 5 may 2015 Arch. Mariano Preview

 


Rapporteur John Pinna – Carmignano (PO)
Control of igrodry treatment area board B.1

Written report Video report Photo report

PDFLgwritten partial report of 20 August 2015

Preview fin


Rapporteur Umberto Bino – Suno (NO)
Technical report on sampling with IgroDry product.

Written report Video report Photo report

PDFLgWritten report of 13 may 2015

Umberto Bino Preview


rapporteur Geom. Franco Soundtracks – Ateleta (AQ)
Technical report on sampling with IgroDry product.

Written report Video report Photo report

PDFLgWritten report of 6 August 2015

Franco Soundtracks Preview

 


rapporteur Geom. Giovanni Delfino – Bracigliano (SADDLE)
Tests on town house 1920 in the old town of Bracigliano.

Written report Video report Photo report

PDFLgWritten report of 20 August 2015

Giovanni Delfino Preview

 


Rapporteur Laura Rossi – Castelnovo Bariano (RO)
IgroDry application 2301 on brick wall face-to-view of about 12 mq

Written report Video report Photo report

PDFLgwritten report of 31 December 2015

 

rossiArred

 

Share
Share